What the contract doesn’t see · Sheet

The recipe
on one page

Project management for international cooperation and government. Rigour without ceremony, so that something changes for someone.

The contract pays for outputs; the project exists for outcomes. Take from the formal methods only what earns its place at the table, and never lose sight of who you are cooking for.

  1. 01

    Start with use, not with the product

    Who will use it, when, through which channel, and who takes charge after closure. No answer means it is your first risk.

    ToolOne-page destination sheet, signed by whoever adopts it.

  2. 02

    Plan with the other side’s calendar

    Elections and contracting restrictions, fiscal year-ends, planning cycles, recesses, changes of administration.

    ToolInstitutional timeline next to the schedule.

  3. 03

    Agree what “done” means before you start

    Acceptance criteria, reviewer, review period and rounds included. Anything else is a change.

    ToolHalf-page product description.

  4. 04

    Measure to decide, not to report

    Few indicators, the same ones the client needs to see. One question: what must we decide this week?

    ToolShared dashboard of five or six indicators.

  5. 05

    Protect the human bridge

    Recognise the focal-point role on both sides and prepare a replacement before you need one.

    ToolThree-page handover folder, always up to date.

  6. 06

    Budget for reality, not heroism

    Review rounds, adjustments, approval waits and handover. If heroes appear, revisit the plan.

    ToolExplicit time and cost reserve, visible to the client.

What goes unseen

  • Money running out changes the goal without warning.
  • A deliverable without an owner loses value the day it is approved.
  • Institutional timing weighs more than quality.
  • The best focal point is also a single point of failure.
  • Good products for the wrong audience don’t work.
  • Review, not production, is often the bottleneck.
  • Heroes cover for bad plans, and cannot be repeated.

Five questions at every decision point

  • Is there still someone who will use this?
  • What changed in the institutional calendar?
  • What is waiting on whom, and since when?
  • If the focal point changes tomorrow, what do we lose?
  • How much of the reserve have we used, and why?
David Yomayusa · davidyomayusa.com/hilosBased on PRINCE2, PMBOK and field experience